Service · COM-05
Commissioning Support
Fluid-side commissioning QA for new liquid-cooled data halls: cleanliness verification, first-fill chemistry and turnover documentation.
The problem
What's at stake
New loops fail for old reasons: construction debris left in piping, flux and oils never flushed, first fills done with the wrong water, documentation that satisfies nobody at turnover. The fluid side of commissioning is where a brand-new hall quietly inherits its future problems.
COM-05 · SCOPE
- Pre-fill cleanliness verification and sampling
- First-fill chemistry: water quality, glycol concentration, inhibitor confirmation
- Baseline lab analysis, the day-one record every future test is compared against
- Leak-detection zone testing as part of integrated systems testing
- Turnover package: baseline certificates, test logs, recommended maintenance schedule
What you receive
A fluid-side turnover package that survives scrutiny: baseline chemistry certificates, cleanliness records, detection test logs and a maintenance schedule the operations team can actually follow from day one.
Our commitment
We work as a subconsultant to your commissioning agent or mechanical contractor, on their schedule, in their format. Our job is to make the fluid scope the easiest sign-off in the building.