Service · COM-05

Commissioning Support

Fluid-side commissioning QA for new liquid-cooled data halls: cleanliness verification, first-fill chemistry and turnover documentation.

The problem

What's at stake

New loops fail for old reasons: construction debris left in piping, flux and oils never flushed, first fills done with the wrong water, documentation that satisfies nobody at turnover. The fluid side of commissioning is where a brand-new hall quietly inherits its future problems.

COM-05 · SCOPE

  • Pre-fill cleanliness verification and sampling
  • First-fill chemistry: water quality, glycol concentration, inhibitor confirmation
  • Baseline lab analysis, the day-one record every future test is compared against
  • Leak-detection zone testing as part of integrated systems testing
  • Turnover package: baseline certificates, test logs, recommended maintenance schedule

What you receive

A fluid-side turnover package that survives scrutiny: baseline chemistry certificates, cleanliness records, detection test logs and a maintenance schedule the operations team can actually follow from day one.

Our commitment

We work as a subconsultant to your commissioning agent or mechanical contractor, on their schedule, in their format. Our job is to make the fluid scope the easiest sign-off in the building.

Book a Loop Health Audit

One visit. Lab-verified answers. A 48-hour written report.